X

Product has been add to cart

Continue Shopping
Check OutView Shopping Cart
Check Out

    My Account       Click here to search.     Order Status


Office Supplies & More 
 


New Covid-19
Rapid Antigen Tests



 


 

 

» Material Handling » Dock Equipment » Levelers

Vestil™ Steel Electric Hydraulic Dock Le

Mfg Part #: SS/78
Premier Part #: B3211200
Manufacturer: VESTIL MANUFACTURING
Optional steel shell for 84 (in.) by 96 (in.) pour in place installation. The steel shells are installed when the concrete is being poured, to provide steel panels on each vertical face of the pit, along with steel flanges along the top faces. Proper installation of a dock leveler requires the leveler to be welded along the upper rear edge of the pit, and the steel shells provide this edge. The steel shells include a front lower steel angle, that gets placed at the front bottom of the pit. This angle provides another essential location where the leveler needs to be welded to the pit.
Retail:    $ 0.00
  $ 1977.78
Total Savings:  
   
IN STOCK    Quantity:
 
Our Partners 

 



 

1407 Foothill Blvd.
Suite 631
La Verne, CA 91750


Toll Free: 800.727.6434
Fax: 800.727.8161


Email Address:
[email protected]






 

Request Form 
Name:
Email Address:
Phone No.:
Comments:
Enter the above code here:
Can't read? Try different words.